next up previous contents
Next: Down Time Up: Period 27 AiC Report Previous: Contents   Contents

Introduction

This report covers the operations of the Nordic Optical Telescope for period 27: 2003-04-01 to 2003-09-31. For the first time this report was prepared with the help of our new, dedicated fault reporting system and data-base.



Thomas Augusteijn 2004-01-06